2018 new sanitary installations

Realized at Kwiro Catholic Parish 2018:

New sanitary installations

The St. Joseph secondary school next to the Church has up to 350 students. The buildings and especially the sanitary installations were in a bad condition and desperately needed a renovation. The classrooms floors damaged with holes, the roof leaking and the doors broken. No water supply in the toilets and blocked drains. Showers pipes leaking and also blocked drains.

We started to plan the renovation of a shower building (Building C) and the construction of two new buildings with toilets (B and B2) in January 2018. Two classes of the Heimbach school for professionals in building construction made the design of the buildings. Special thanks go to the teachers Felix Luethi and Peter Helfenstein for supporting our project.

More information about this cooperation.

The detailed plans are downloadable. Please use it for free.